Experience on Internationally Funded Projects
ROTERM and its experts have rich experience working on internationally funded projects, both as project leaders and as partner company within international joint ventures.
Working on EC CARDS and IPA projects, as well as on EBRD, IBRD and UNDP Projects, we have gained indispensible hands on experience of EC PRAG, and FIDIC YELLOW and RED book contract procedures.
From our experience on internationally funded projects we can emphasize:
Project Title: | Water Supply and Sewerage Improvements and Construction of Wastewater Treatment Plant in the Municipality of Drnis | |||||
---|---|---|---|---|---|---|
Services Provided: | Complete Works Supervision Services | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Name of Consortium Members |
Croatia | 5,7 million EUR | 5 | Hrvatske vode |
European Commission, IPA |
2010 - ongoing |
Posch & Partners GmbH, AU; Hydro Ingenieure GmbH, AU |
Detailed Description of the Project | ||||||
Construction of a Waste Water Treatment Plant
Construction of WWTP with a capacity of 5,000 PE and 900 m3/day, based on FIDIC Plant and Design-Build Conditions, Yellow Book and Croatian Physical planning and Construction Act (Official Gazette76/2007). Construction and Rehabilitation works for Water Supply and Sewerage networks Construction Works of the Water Supply, Wastewater and Stormwater networks in the town of Drnis, based on FIDIC Red Book and Croatian Physical planning and Construction Act (Official Gazette76/2007). Water Supply Rehabilitation of the water supply network. Total length 4,606 meters, including 8 concrete chambers, 40 valves, 6 electro valves and appurtenances, 20 hydrants. Sewerage Network Rehabilitation of sewer network and network extensions with a total length of 6,726 meters. Mapping, inspecting and cleaning existing sewers, length 1,367 meters of which approx. 350 meters requires various repairs. Reconnection of sewage connections to previously constructed fecal sewer. Construction of a main collector with a length of 844 meters for connecting to the WWTP. |
Project Title: | Construction of Bikarac Regional Waste Management Centre, Sibensko-kninska County | |||||
---|---|---|---|---|---|---|
Services Provided: | Subcontracted Mechanical, Electrical and Geotechnical Works Supervision Services | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Supervision Contract Holders |
Croatia | 6,1 million EUR | 3 | CFCA Croatia |
European Commission, IPA |
2010 - 2012 |
Fichtner GmbH & Co. KG., DE; MHM-inzenjering ltd. Osijek, HR |
Detailed Description of the Project | ||||||
Construction of Bikarac Regional Waste Management Centre. Construction works for remediation of existing landfill at Bikarac and construction of new landfill area, and also closure and remediation of the existing landfill site at Pirovac. The construction works implemented according to FIDIC Yellow Book Conditions of contract and Croatian Physical planning and Construction Act (Official Gazette76/2007). |
Project Title: | Integral Project of Kastela Bay Protection | |||||
---|---|---|---|---|---|---|
Services Provided: | Mechanical Works Supervision Services, Technical Consulting Services in domain of Mechanical Engineering | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Name of Consortium Members |
Croatia | 220 million EUR | 2 | EKO Kastela Bay Agency |
IBRD, EBRD |
2004 - ongoing |
n/a |
Detailed Description of the Project | ||||||
The Integral Project of Kastela Bay Protection covers the broader area of the city of Split and the towns of Solin, Kastela and Trogir. It is implemented through the following subprojects:
The ECO Project comprises reconstruction of the sewage network and improvement and extension of the water supply system. It covers construction of structures for collection, treatment and disposal of wastewater under the sewage systems (sewer network, pipelines, pumping stations, wastewater treatment plant, submarine crossing, hydrotechnical tunnel, submarine outfall), as well as construction of facilities for improvement and extension of the water supply system (pumping stations, water reservoirs, pressure and gravity lines). |
Project Title: | UNDP Energy Audits and Energy Studies | |||||
---|---|---|---|---|---|---|
Services Provided: | Complete Energy Auditing and Energy Studies development | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Name of Consortium Members |
Croatia | 290,000 EUR | 3 | UNDP Croatia |
UN, GEF, FZOEU Croatia |
2006 - ongoing |
n/a |
Detailed Description of the Project | ||||||
|
Project Title: | Water Supply and Wastewater Infrastructure Works in Sibensko-kninska and Zadarska Counties | |||||
---|---|---|---|---|---|---|
Services Provided: | Complete Works Supervision Services | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Name of Consortium Members |
Croatia | 3,2 million EUR | 3 | European Commission |
European Commission, CARDS |
2006 |
Alanet Global; Posch & Partners GmbH, AU |
Detailed Description of the Project | ||||||
5 infrastructure sub-projects have been bundled together to form a single contract. Project was managed under FIDIC conditions and Croatian Physical planning and Construction Act. The sub-projects were as follows: Kistanje Water Supply: Replacement of the damaged transmission main from Kistanje to Macure Pumping Station to facilitate water supply to four villages including: construction of a new 300 mm dia. transmission main approximately 1,800 meters long between Kistanje and Kistanje Selo, and a new 250 mm dia. main approximately 3,400 meters long between Kistanje Selo and Macure. Marici Channel (Knin): Reconstruction of the Marici drainage channel approximate length of 1,645 meters. Skabrnja-Zemunik Water Supply: Approximately 1,300 meters of 400 mm dia. ductile iron transmission main and 11,700 meters of 80 – 400 mm dia. ductile iron distribution system. Podi Business Zone (Sibenik): Construction of roads and all services for the first 20 ha of a Business Zone in Podi, including approx. 1.4 km of roads, water distribution system approx. length of 2.5 km (100 – 250 mm dia.), foul sewers approx. length of 2.2 km (160 – 400 mm dia.) and package wastewater treatment plant; rainwater drainage system approx. length of 3.0 km (160 – 40 0mm dia.) with oil separator; electricity cable network approx. length of 2.7 km and 4 No. 10(20)/04kV substations; street lighting incorporating 76 lighting poles, and conduit network for telephone cables. Mandalina Office Complex (Sibenik): Refurbishment of the former “Remont” complex (previously used by ship maintenance firms) to provide office facilities. |
Project Title: | Water Supply and Wastewater Infrastructure Works in Sibensko-kninska and Zadarska Counties | |||||
---|---|---|---|---|---|---|
Services Provided: | Subcontracted Mechanical, Electrical and Geotechnical Works Supervision Services | |||||
Country | Overall Project Value (EUR) | No. of Staff Provided | Name of Client |
Origin of Funding |
Dates (start/end) |
Name of Consortium Members |
Croatia | 2,9 million EUR | 3 | European Commission |
European Commission, CARDS |
2005 - 2006 |
Alanet Global; Posch & Partners GmbH, AU |
Detailed Description of the Project | ||||||
5 infrastructure sub-projects have been bundled together to form a single contract. Project was managed under FIDIC conditions and Croatian Physical planning and Construction Act. The sub-projects were as follows: Lisicic Water Supply: High density polyethylene (HDPE) water transmission main approximately 1.3 km of 355 mm dia., 2.1 km of 315 mm dia. in an existing partially excavated trench, and completion of a booster pumping station including all mechanical and electrical equipment. Podgradina Water Supply: 150 mm dia. HDPE transmission main approximately 3.3 km long, a 250 m³ reinforced concrete reservoir and access road approximately 230 meters long. Skradin Wastewater: Construction of a wastewater pumping station (output 15 – 17 l/s), 180 mm dia. HDPE pumping main approximately 0.46 km long, wastewater treatment plant (based on the activated sludge process) and 200 mm dia. HDPE effluent pipe approximately 1.0 km long, to serve a population equivalent of 2,600. Piramatovci Water Supply: Water distribution system with approximately 4.4 km of pipelines (1” – 250 mm dia.). Promina Water Supply: 125 mm dia. HDPE distribution main approximately 10 km long to serve the villages of Matase, Zelici and Marasovine. |